UK Transport Wiki
Register
Advertisement
Sawbridgeworth
Sawbridgeworth
Sawbridgeworth railway station in 2010
Location
PlaceSawbridgeworth
Local authorityEast Hertfordshire
CoordinatesTemplate:Coord/display/inline,title
Grid referenceTemplate:Gbmapscaled
Operations
Station codeSAW
Managed byGreater Anglia
Owned byNetwork Rail
Platforms in use2
Live arrivals/departures and station information
from National Rail
Annual rail passenger usage
2004/05 * 0.392 million
2005/06 *File:Increase2.svg 0.393 million
2006/07 *File:Increase2.svg 0.404 million
2007/08 *File:Increase2.svg 0.451 million
2008/09 *File:Decrease2.svg 0.448 million
History
Opened 1842 (1842)
National Rail - UK railway stations
Template:Hide in print
* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Sawbridgeworth from Office of Rail Regulation statistics.
Template:Portal frameless

Sawbridgeworth railway station serves the town of Sawbridgeworth in Hertfordshire, England. Formerly, part of the station was in Essex and it is still immediately adjacent to the boundary with Lower Sheering, in the Epping Forest District. It is managed by Greater Anglia.

Both platforms were extended to accommodate 12-coach trains in December 2011, though initially no 12-coach trains are scheduled to call.

Services[]

The typical Monday-Saturday off-peak service is:

(Passengers can also reach Liverpool Street by taking the Stratford service and changing at Harlow Town.)

  • 1 tph to Stratford, calling at Harlow Mill, Harlow Town, Roydon, Broxbourne, Cheshunt, Enfield Lock, Northumberland Park and Tottenham Hale, taking 47 minutes.

(Passengers can also reach Stansted Airport by taking either Cambridge service and changing at Bishop's Stortford.)

  • 2 tph to Cambridge, of which:
    • 1 calls at Bishop's Stortford, Audley End and Whittlesford Parkway, taking 37 minutes.
    • 1 calls at Bishop's Stortford, Stansted Mountfitchet, Elsenham, Newport (Essex), Audley End, Great Chesterford, Whittlesford Parkway and Shelford, taking 44 minutes.
File:Sawbridgeworth railway station in 2010.jpg

During the snow of January 2010

On Sundays this becomes:

  • 1 tph to London Liverpool Street as per the first layout above, taking 38 minutes.

(Passengers can also reach Liverpool Street by taking the Stratford service and changing at Harlow Town.)

  • 1 tph to Stratford, calling at Harlow Mill, Harlow Town, Roydon, Broxbourne, Cheshunt, Waltham Cross, Enfield Lock, Brimsdown, Ponders End and Tottenham Hale, taking 51 minutes.
  • 2 tph to Cambridge as above, taking 37 and 45 minutes respectively.

(Passengers can reach Stansted Airport by taking either Cambridge service and changing at Bishop's Stortford.)

External links[]

Preceding station National Rail logo.svg National Rail Following station
Harlow Mill   Greater Anglia
West Anglia Main Line
  Bishop's Stortford

Template:West Anglia Main Line navbox

Template:EastEngland-railstation-stub

Advertisement