UK Transport Wiki
Advertisement

Phase 1 (21 November 1998)[]

Bus Route Changes
108 Rerouted via North Greenwich, and Blackheath via Stratheaden Road and Prince of Wales Road instead of Vanburgh Park - Charlton Way and Prince Charles Road.

Phase 2 (23 January 1999)[]

Bus Route Changes
99 Converted to low floor operation.
244 Extended to Abbey Wood.
272 Withdrawn, replaced by route 472.
469 Rerouted between Plumstead and Abbey Wood, as well as between Erith and Bexleyheath.
472 New route from North Greenwich to Thamesmead.
B13 Withdrawn between Bexleyheath and Erith, replaced by route 469.
X72 Withdrawn, replaced by route 472.

Phase 3 (1 May 1999)[]

Bus Route Changes
5 Converted to low floor operation.
69 Diverted at Connaught Bridge to London City Airport - Silvertown to North Woolwich replaced by 474.
147 Barking allocation moved to Upton Park allocation, and extended from Keir Hardie Estate to Canning Town.
188 Extended from Greenwich to North Greenwich Station and converted to low floor operation.
300 Upton Park allocation moved to Barking allocation.
330 Withdrawn between Canning Town and Blackwall.
474 New route from Canning Town to East Beckton.

Phase 4 (29 May 1999)[]

Bus Route Changes
422 Extended from Woolwich to North Greenwich.

Phase 5 (7 August 1999)[]

Bus Route Changes
161 Extended from Woolwich to North Greenwich and converted to low floor operation.

Phase 6 (18 September 1999)[]

Bus Route Changes
1 Withdrawn school journeys to Rotherhithe, and extended from Surrey Quays to Canada Water. At the same time, converted to low floor operation.
5 Sunday extension from Canning Town to Old Street withdrawn.
15 Withdrawn between Poplar and Canning Town (replaced by 309) and diverted to Blackwall Station.
47 Rerouted via Canada Water Station.
59 New route from Streatham Hill to Euston.
109 Withdrawn between Brixton and Trafalgar Square, this section was replaced by route 159.
159 Diverted at Kennington Road to run via Westminster Bridge instead of Lambeth Bridge to partly replace the withdrawn section of 109. 
188 Withdrawn between Russell Square and Euston, and diverted at Rotherhithe via Canada Water station.
199 Withdrawn between Canada Water and Elephant & Castle.
276 Withdrawn between Newham General Hospital and East Beckton (replaced by 376).
300 Withdrawn between Royal Albert Station and Cyprus, and diverted to Canning Town (replaced by 376).
309 Extended from Poplar to Canning Town.
376 New route from East Ham to East Beckton, replacing route 276 and 300.
D7 Diverted via Canary Wharf Station.
X53 Withdrawn.

Phase 7 (9 October 1999)[]

Bus Route Changes
381 New service from Peckham to Waterloo, replacing P11.
N70 Renumbered service N381.
N381 New service from Peckham to Trafalgar Square, replacing N70.
P11 Renumbered service 381.
P13 Amended via Canada Water Station.

Phase 8 (1 January 2000)[]

Bus Route Changes
M1 New service from North Greenwich to Charlton.
M2 New service from North Greenwich to Greenwich.

Phase 9 (8 January 2000)[]

Bus Route Changes
N1 Extended from Plumstead to Thamesmead, replacing N53.
N53 Withdrawn between Trafalgar Square and Victoria, and withdrawn between Plumstead and Thamesmead.
Advertisement