UK Transport Wiki

Welcome to the UKTransport Wiki!

It's the place for all your UKTransport needs!

So why not just create an account and help the wiki groW!?

Remember!

READ MORE

UK Transport Wiki

This article is part of a series on the History of rail transport in Great Britain

The period from 1995 covers the history following the privatisation of British Rail. During this period, passenger volumes grew rapidly,[1] although there were public concerns about the scale of subsidies.

Reform under the Labour government[]

The Labour government (elected in 1997 after the majority of the privatisation process had been completed) did not completely reverse the railway privatisation of the previous administration. Initially it left the new structure largely in place, however its main innovation in the early years was the creation of the Strategic Rail Authority (SRA), initially in shadow form until the Transport Act 2000 received Royal Assent.

In the wake of the Hatfield rail crash in 2000, Railtrack entered into financial meltdown and the industry was in deep crisis. Labour refused to continue to bail out Railtrack and the company was put into Railway Administration in 2001 and a new company, Network Rail emerged to replace Railtrack in 2002. Network Rail is a nominally private "not for dividend" company. However, its borrowing is backed by the government (which allowed better interest rates on loans), so its status is a confusing one.

The Strategic Rail Authority lasted just five years. Following the passing of the Railways Act 2005, its business was wound up and its functions transferred to the Department for Transport Rail Group and the Office for Rail Regulation. [2] Further changes have followed, which has seen the government take back a greater degree of control but the early demise of the SRA suggests that the right formula for the long-term health of the rail industry has not yet been agreed.

Another important development occurred in the aftermath of the Potters Bar accident in May 2002 when a commuter train derailed (coincidentally on the same stretch of the East Coast Main Line as Hatfield) due to poorly maintained points. This resulted in Network Rail taking all track maintenance back in house and the industry went on to enjoy the longest period in modern times without a fatal accident due to industry error. This came to an end in February 2007 when a Virgin Pendolino derailed near Grayrigg in Cumbria, killing one person. The cause of the accident was identical to that in Potters Bar nearly five years earlier - once again calling into question Network Rail's maintenance procedures.

Current developments[]

The British railway system continues to be developed. Contemporary projects include:

  • High Speed 1, a project to construct a 67 mile high-speed rail line from London to the British end of the Channel Tunnel, and involving a great deal of complex civil engineering including a 1404 yard bridge over the River Medway, a 2 mile tunnel under the Thames near Dartford, a 2 mile tunnel through the North Downs, 12 mile twin tunnels running into central London, a major new railway station extension to St Pancras Station in London, and a complex redesign and rebuild of the King's Cross St Pancras tube station. The southern phase 1 of the project opened in September 2003, and northern phase 2 opened in November 2007.
  • The West Coast Main Line upgrade is a long-term project covering a series of technical aspects. Improvements include the four-tracking (from three) of the Trent Valley (a bypass of the West Midlands), redesigning the layout of several junction/station e.g. Rugby and other associated work to increase line speed. This culminated in tilting trains at 125 mph being extended to Glasgow in 2005. Work continues and the cost overruns of the programme are infamous - attributed to wide scope of programme (the promise to Virgin to build a 140 mph railway which would require moving bloc signalling) and poor project management by the defunct Railtrack.
  • The Thameslink Programme, formerly known as 'Thameslink 2000' is underway as the government formally approves the project. The project includes the lengthening of platforms, station remodelling, new railway infrastructure (e.g. viaducts) and additional rolling stock, which will allow First Capital Connect to expand their Thameslink services further north and south.
  • Scotland
    • The Stirling-Alloa-Kincardine railway, a rare 13 mile (21 km) extension to the network, to the north of the Firth of Forth in Scotland. A Bill for the railway was passed by the Scottish Parliament and received Royal Assent in August 2004. Work commenced in September 2005, with services running by Spring 2008. The line re-establishes a railway decommissioned in 1983; the new line will provide passenger connections to Glasgow, and freight links between the site of Kincardine power station, now used as a loading point for coal from open-cast sites, to avoid heavy traffic through Kincardine, and Longannet power station, and the coal terminals at Hunterston Deep Water Port. There has been recent doubt about the project as Longannet power station was due to close in 2015, and would have been operating for reduced hours before then, to meet emissions targets. However the present shortage of generating capacity has caused this to be reviewed, and full operation of the power station will continue. The passenger part of the scheme, from Stirling to Alloa was in any case secure, and the Scottish Parliament appear to be in favour of passenger services being extended to Rosyth, which is an important ferry terminal. This could possibly result in passenger stations serving the communities of Clackmannan, Kincardine, and Culross or Valleyfield, and through trains once more from Stirling to Dunfermline.
    • A short extension of the Glasgow-Hamilton-Motherwell, which once again links Larkhall to the railway network after 40 years. Larkhall has for some time been the largest town in Scotland without a railway station. The new £35m line follows an existing formation, and services to Larkhall railway station resumed on 12 December 2005.[2] The new section of route is electrified and is served with trains from Dalmuir, via Glasgow Central Low Level, with connections from other northern suburbs of Glasgow such as Milngavie.
    • Having received approval and construction started, the Airdrie-Bathgate line should be complete by December 2010. Work started in June 2007. The Airdrie-Bathgate proposal is quite extensive insofar as it proposes double track electrification, the present remnant of the line from just outside Edinburgh to Bathgate having been largely singled some time ago.
    • A proposal for re-opening of the Waverley Route from Edinburgh to the Borders has been passed by the Scottish Parliament. This plan falls slightly short of what some people want, such as certain intermediate stations and longer passing loops, to allow more communities to be served while maintaining or improving the end to end timings.
    • The Glasgow Airport Rail Link was given the final go ahead by the Scottish Parliament in December 2006. A new 1.5 mile spur was to be built onto the existing Inverclyde route, and the Glasgow Central - Paisley line would have been upgraded to triple track, with the additional benefit of increasing capacity on the Ayrshire and Inverclyde routes. The project was scrapped by the Scottish Parliament in September 2009.

In Wales, the Welsh Assembly Government re-opened the Vale of Glamorgan Line between Barry and Bridgend in 2005, re-opened the Ebbw Valley Line between Ebbw Vale and Cardiff and proposes to extend the line into Newport in the future. The Assembly Government is also looking into opening the Hirwaun to Aberdare route in the Cynon Valley.

Present Locomotives and Rolling Stock[]

Diesel Locomotives[]

Image Class Operator(s) Image Class Operator(s)
File:20903 at Doncaster Ron Hann.jpg 20 File:Veolia Cargo Nederland.jpg 21 Euro Cargo Rail
File:31128 'Charybdis' at Bristol Temple Meads.JPG
31
File:37038 at Crewe Works.jpg
37
File:City of Bristol Class 43 locomotive 01.jpg
43
File:47818 at Cambridge.JPG
47
File:56303 Kingsthorpe Fresh Air Express.jpg
56
  • Fastline3
File:57304 'Gordon Tracy' at Crewe.jpg
57 59
File:60068 by Castleton East Junction.jpg
60
File:66108 at Didcot.JPG
66
File:67017 'Arrow' at Plymouth.JPG
67
File:73201 at Woking.jpg
73a

a BR Class 73 is an electro-diesel locomotive which allows electrified and non electrified route workings.

Electric Locomotives[]

Image Class Operator(s) Image Class Operator(s)
File:86613 and 86610 at Ipswich.JPG
86
File:90049 at Ipswich.JPG
90
File:91101 at Kings Cross.jpg
91
File:92001 'Victor Hugo' at Crewe Works.jpg
92
File:73201 at Woking.jpg
73a Eurotunnel Class 9
  • Eurotunnel

a BR Class 73 is an electro-diesel locomotive which allows electrified and non electrified route workings.

Diesel Multiple Units[]

Image Class Operator(s) Image Class Operator(s)
File:142041 Northern Rail Castleton East Jcn.jpg

142
143
144

File:150246 at Plymouth.JPG
150
File:Patchway-153372-04.jpg
153
File:Northern-155346-02.jpg
155
File:156427 at Carlisle.JPG
156
File:158798 at Doncaster.JPG
158

159

File:Chiltern train at Kidderminster.jpg

165
166
168

File:170433 at Edinburgh Waverley.JPG
170

171

File:175111 'Brief Encounter' at Crewe.jpg
175
File:180110 at Bath Spa.JPG
180
File:185103 at Castleton East Junction.jpg
185
File:Virgin trains 221113 glasgow.jpg

220
221
222

AC Electric Multiple Units[]

Image Class Operator(s) Image Class Operator(s)
File:31311 at Euston.jpg

313
314
315

File:317655 at Cambridge.JPG

317
318

File:FCC train at Harpenden.JPG
319
File:321901 at Doncaster.JPG

320
321
322

File:323225 at Manchester Piccadilly.JPG
323
File:325016-Crewe-01.jpg
325
  • EWS for Royal Mail
File:Train at Ilkley.JPG

332
333

File:British Rail Class 334 005.jpg
334
File:350120 Rugeley 2010-06-22.JPG
350
File:357036 at Southend Central.jpg
357
File:360111 at Ipswich.jpg
360
File:FirstCapitalConnect Unit365505.jpg
365
File:Eurostar at Vauxhall.jpg
373
File:377122 at Clapham Junction.JPG

375
376
377
378

File:390029 'City of Stoke-on-Trent' at Birmingham New Street.JPG
390
File:Unit 395008 at Ebbsfleet International.JPG
395

DC Electric Multiple Units[]

Image Class Operator(s) Image Class Operator(s)
File:BBC South Today at London Waterloo.jpg
442
  • Southern
File:UK450015.jpg

444
450

File:SWT Class 455 refurbished.jpg
455
File:456006 at East Dulwich.jpg
456
File:8030 at London Waterloo.JPG
458
File:460007 at London Victoria.jpg
460
File:465237 at Waterloo East.jpg

465
466

File:507011 Liverpool South Parkway.jpg

507
508

Coaches[]

Image Model Operator(s) Image Model Operator(s)
File:Mk 2F TSO 6035 at Carlisle.JPG
BR Mk II
File:British Rail Mk 3 42199 at Kings Cross.jpg
BR Mk III
File:British Rail Mark 4 De-Branded.jpg
BR Mk IV
File:British Rail Mark 3A SLEP 10590 at Penzane.JPG
BR Mk III Sleeper

Details of Withdrawn Locomotives and Rolling Stock : See Article Withdrawn British Rail Stock

References[]

  • Wolmar, Christian (2005). On the Wrong Line: How Ideology and Incompetence Wrecked Britain's Railways, rev. ed., London: Aurum Press. ISBN 1-85410-998-7. 
  1. ATOC (2011-02-21). Retrieved on 2011-02-21.
  2. [1]

External links[]

Template:Commonscat


pre-1830
The pioneers

1830–1922
Early development

1923–1947
The Big Four

1948–1994
British Rail

1995 to date
Post-privatisation