Aylesbury Vale Parkway
File:AylesburyVPkwy2009.JPG
The platform at Aylesbury Vale Parkway
Location
PlaceAylesbury
Local authorityAylesbury Vale
CoordinatesTemplate:Coord/display/inline,title
Grid referenceTemplate:Gbmapscaled
Operations
Station codeAVP
Managed byChiltern Railways
Platforms in use1
Live arrivals/departures and station information
from National Rail
Annual rail passenger usage
2008/09 *13,058
History
Opened 14 December 2008 (14 December 2008)
National Rail - UK railway stations
Template:Hide in print
Template:Portal frameless
File:Aylesbury Vale Parkway.JPG

Aylesbury Vale Parkway looking north on the first day of services.

Aylesbury Vale Parkway railway station is a railway station serving villages to the northwest of Aylesbury. It will also serve the Berryfields and Weedon Hill housing developments to the north of the town when these are completed. The station is served by Chiltern Railways and opened on December 14 2008. The station building opened on 1 June 2009.[1]

Background[]

The Office of the Deputy Prime Minister announced in April 2006 that it would be providing £8.17 million for track and signalling improvements to the existing line, which was only used to carry freight. The line is part of the old Metropolitan line/GCR which connected London and Aylesbury with the Midlands and North.

A further £2.8 million was be invested by Chiltern Railways' owners Laing Rail and £1m from Buckinghamshire County Council.

The station provides parking for 400 cars and links in to existing public transport bus services along the A41 corridor. A bus service from the station to several villages north of Aylesbury commenced on December 15 2008. This service, route 16 operated by Arriva, diverts via the station at times to meet London-bound commuter trains, and is free for holders of a Chiltern Railways season ticket of one month-or-longer length.[citation needed]

Construction began in October 2007[2] and the rail works were completed by Carillion Rail.[3] The station was originally not due to be completed until 2010,[4] however, it opened ahead of schedule. Between its opening and 31 May 2009, whilst the station buildings were under construction, tickets and facilities were available from portakabins.[5]Template:Deadlink

Services[]

The off-peak service level is one hourly train to Marylebone via Amersham. During peak periods there are up to three trains per hour to Marylebone.[6] The journey time to Aylesbury is about four minutes.

Future plans[]

There has been talk of extending the line by 2012 beyond the Parkway station to Quainton, Bletchley, Milton Keynes and Oxford using portions of the former Varsity Line. Whether or not this will happen is still unknown. The platform has been built to accommodate a second track if ever implemented, which would create an island platform.[citation needed]

The track between Aylesbury and the new station was upgraded to continuous welded rail with a maximum line speed for DMU passenger trains of 60 mph.

See also[]

  • East West Rail Consortium

References[]

  1. Aylesbury Vale Parkway fully open on Monday, 1 June. Retrieved on 1 June 2009. [dead link]
  2. The next stop will be Aylesbury Vale Parkway. Buckinghamshire County Council. Retrieved on 2008-06-04. [dead link]
  3. Access to Aylesbury Vale Parkway. Buckinghamshire County Council (2008-10-19). Retrieved on 2008-12-30. [dead link]
  4. New Aylesbury Vale Parkway station to open in 2010. Chiltern Railways (2006-04-11). Retrieved on 2008-06-04..
  5. Template:Cite news
  6. Aylesbury Vale Parkway (Microsoft Word). Chiltern Railways. Retrieved on 2008-04-15.

External links[]

Template:Commonscat Template:Stn art lrnk

Preceding station National Rail Following station
Terminus   Chiltern Railways
London-Aylesbury
  Aylesbury